Our completed Projects
Construction Project | KCC | 2021
15kV line construction in Kolwezi, KCC Mine.
Construction project | MMG Mine | 2020
Construction of 33kV MV lines. ALENG is doing the project management for this line construction
Consulting Project | BPC | 2017
Electrical Network Master Plan for the entire Country.
Supply of Cables to KAMOA mines | 2021
Supply of low voltage cables to KAMOA Mines.
Various Power system studies for Grootegeluk mine in 2014
Ranging from Load Flow, Protection Studies and others.
Construction project | Umhlathuze | 2021
132kV substation construction in Umhlathuze.
Construction project | SNEL | 2019
220kV Station de Conversion de Kolwezi (SCK) substation.
132 HV Cable supply to CONCO for Tanzania project
During this project, we have supplied major equipment to Tanzania electricity utility via our client Consolidated Power Project. Amongst others, we supplied HV cable, cable termination, cable joints, clamps and others.
Supply of Poles to Virunga company | 2020
Supply of Poles to Virunga.
Design and Supply of various tools to KCC mine
Project Value: R8 000 000